CO129-179 - Governor Hennessy - 1877 [9-12] — Page 401

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

Drawing Nr. 4.

Ward which forms the basement of Wing A.

Present Female associated

Drawing

W. 5. Ground plan of the Gaol premises as proposed to be re-arranged.

Buildings coloured blue in Drawing Nr. 1 are cleared away.

Offices for Superintendent by the new block and new quarters and Staff.

Drawing Nr. 1 and out. substituted in red for adaptation to Separate Séption. The

adaptation of first and second floors to the Separate System.

W. 6. Plan showing proposed

399

Abstract of Estimated cost of Adapting Victoria Gaol to the Separate System with 502 Cells.

Conversion of Wing A into 171 Separate cells $11,949.44 Building a New Wing B. with 72. $14,332.41 Conversion of Wing Building & New Wing Extension and Conversion of Wing B into 87 $3,949.57 do. $10,080.08 Construction of a new detached Block with 130. $7,489.20 Demolition of buildings $4,4819 and re-erection of quarters and offices for Gaol Staff $34,857 Improved water supply and drainage $15,103 Total $95,780.077 $42 0.0 1000- oo.

"(The Copy)

Castis

Colonial Secretary

Edit History

2026-05-21 20:08:12 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Drawing Nr. 4. Ward which forms the basement of Wing A. Present Female associated Drawing W. 5. Ground plan of the Gaol premises as proposed to be re-arranged. Buildings coloured blue in Drawing Nr. 1 are cleared away. Offices for Superintendent by the new block and new quarters and Staff. Drawing Nr. 1 and out. substituted in red for adaptation to Separate Séption. The adaptation of first and second floors to the Separate System. W. 6. Plan showing proposed 399 Abstract of Estimated cost of Adapting Victoria Gaol to the Separate System with 502 Cells. Conversion of Wing A into 171 Separate cells $11,949.44 Building a New Wing B. with 72. $14,332.41 Conversion of Wing Building & New Wing Extension and Conversion of Wing B into 87 $3,949.57 do. $10,080.08 Construction of a new detached Block with 130. $7,489.20 Demolition of buildings $4,4819 and re-erection of quarters and offices for Gaol Staff $34,857 Improved water supply and drainage $15,103 Total $95,780.077 $42 0.0 1000- oo. "(The Copy) Castis Colonial Secretary
Baseline (Original)
i brawing Nr. 4. Ward which formes the basement of Wing A. Present Female associated brawing h W. 5. Ground plan of the Gaol se- premises as proposed to be re- · arranged Buildings coloured blue in Drawing fox adaptation to Separate Séption. The brawing Nr. 1 are cleared away. and out. Offices for Superintendent by the new block and new quarters and substituted in red Drawing and Staff. to the Separate System. adaptation of firch and second floors W. 6. Plan showing proposed d 399 Abettack of Estimated cost of Adapting Victoria Gast to the Separate System »" with 502 Cello. Conversion of Wing A into 1/1 Separate cells Building a New Wing B. with 7/2. Cwiko Conversion of Wing Building & New Wing Extension and Conversion p- 11.9 A with 48. of Wing. Bo into 87 do to Construction of a new detached Block with 130. Demolition of buildings Improved water do $8967. 44 14332 41 3949.57 10080. 08 7489. 20 $44819 34857 and re-exection of quarters and offices for Gaol Stoff 15103 Supply. and drainage "(The Copy) . 42 0.0 کاهی 1000- oo. Total # 95,780. 077 H Castis Colonial Secretaris
2026-05-21 20:08:12 · Baseline
View content

i

brawing Nr. 4.

Ward which formes the basement of Wing A.

Present Female associated

brawing

h

W. 5. Ground plan of the Gaol

se-

premises as proposed to be re-

· arranged

Buildings coloured blue in Drawing

fox adaptation to Separate Séption. The

brawing Nr. 1

are cleared

away.

and out. Offices for Superintendent by the new block and new quarters

and substituted in red

Drawing

and Staff.

to the Separate System.

adaptation of firch and second floors

W. 6. Plan showing proposed

d

399

Abettack of Estimated cost of Adapting Victoria Gast to the Separate System »" with 502 Cello.

Conversion of Wing A into 1/1 Separate cells

Building

a New Wing B. with 7/2.

Cwiko

Conversion of Wing Building & New Wing

Extension and Conversion

p- 11.9

A with 48.

of Wing. Bo into 87

do

to

Construction of a new detached Block with 130.

Demolition of buildings

Improved water

do

$8967. 44

14332

41

3949.57

10080.

08

7489. 20

$44819

34857

and re-exection of quarters and offices for Gaol Stoff 15103

Supply.

and drainage

"(The Copy)

.

42

0.0

کاهی

1000-

oo.

Total # 95,780.

077

H

Castis

Colonial Secretaris

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.